Product Name | PU sandwich panel |
Surface Material | color steel(PPGI), stainless steel, aluminum |
Core material | Polyurethane foam |
PU density | 45±2KG/m3 |
Fire grade | B2 |
Width | standard width 1000mm, maximum 1050mm |
Length | Customized, maximum 11980mm |
Thickness | 50/75/100/150/200mm |
Step | Contents | Details |
1 | Detailed requirements provided by client | 1. Is there any L*W*H size or sketch? We can understand the dimension and how many chambers will be there. |
2. What is the working temperature? We recommend -1~10℃ for fruit and vegetables, -18~ -25℃ for fish and meat. The temperature can be customized of course, and can be adjusted within ±5℃ | ||
3. If you don’t know about the Q1 & Q2, what products would you like to keep in the cold room? And how much MT please? | ||
4. What is the power supply? 380V/50HZ/3phase or other specification | ||
5. What is the highest and lowest ambient temperature? Is there any salty environment by the sea or not? | ||
6. Is there any other special requirement? | ||
2 | 1. Discussion and modification until we reach an agreement | |
2. Detailed quotation for a complete set of cold room, including pictures and basic technical data | ||
3. Sketch design (if necessary) | ||
3 | 1. Sigh the contract and formal design | |
2. Payment: 30% by T/T in advance, 70% by T/T or L/C | ||
4 | Delivery and docs | 1. Prepayment 30% by T/T in advance |
2. Production: normally 25~30 days per set | ||
3. Pictures update when the products are ready | ||
4. Balance payment by T/T or L/C | ||
5. Delivery by sea/ train | ||
5 | Installation (if necessary) | 1. Contract of the installation is made |
2. Prepayment of the installation charge | ||
3.Client prepare the construction site and foundation. | ||
4.Client prepare the on-site electricity and water | ||
5. Working procedure confirm and team organization; | ||
6. Construction teams go to install. | ||
6 | Check and acceptance (if necessary) | 1. Our technicians trial run the cold storage on-site; |
2. Client checks and makes acceptance. | ||
3. Balance payment of the installation charge | ||
7 | Operation instruction and warranty (if necessary) | 1.Train the clients’ cold storage operators; |
2. Provide technical support within the lifetime of cold storage. |
Контактное лицо : | Yang |
---|